Before and after. Ready for hardware and strings |
Crack repaired and top sanded |
Black top touched up ready for varnish. |
Applying the shellac varnish |
Varnished |
Varnish applied to the back |
Shiny new peghead |
Front and back |
Before and after. Ready for hardware and strings |
Crack repaired and top sanded |
Black top touched up ready for varnish. |
Applying the shellac varnish |
Varnished |
Varnish applied to the back |
Shiny new peghead |
Front and back |
This is looking great and I am sure that Charlie is loving it. How long til it is done?
ReplyDelete